Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Princess Street Bridge | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Route One Highways were chosen by A E Yates to carry out the waterproofing works to the new structure, replacing the rusty bridge on the verge of being closed.

Case Study Case Study

Princess Street Bridge

Client: A E Yates

Location: North West

Products: Two Coat Waterproofing System

Works on Princess Street Bridge in Blackpool began at the start of November 2015 by main contractor A E Yates.

Route One carried out deck preparation prior to the installation of Stirling Lloyd’s two coat Eliminator Waterproofing System to the new bridge deck.

The new bridge will cover a smaller area of the road below making Princess Street Bridge brighter and safer for local residents.

• Stirling Lloyd’s two coat Eliminator
• Deck Preparation carried out prior to installation
• Rusty bridge on the verge of closure