Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Misterton Salt Barn, Lutterworth - Route One Infrastructure
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Route One working for Leicestershire County Council undertook waterproofing treatment works to the inside and top of the concrete retaining wall at Misterton Salt Barn.

Case Study Case Study

Misterton Salt Barn, Lutterworth – Sika FerroGard – 903 and Fosroc Mulseal DP

Client: Leicestershire County Council

Location: East Midlands

Products: Sika FerroGard - 903 and Fosroc Mulseal DP

Two coats of Ferrogard, a surface applied mixed corrosion inhibitor were applied to prevent the corrosion of the steel followed by two coats of Mulseal, a bitumen rubber/latex compound that has low water vapour permeability.

Feedback from the LCC Engineer: “Well set up gang, good equipment; Office staff answered all questions promptly by email; Friendly helpful staff on site; Good finish and attention to detail; Easy to deal with, helpful and delivered as promised.”

  • Sika Ferrogard – 903 – surface applied mixed corrosion inhibitor to prevent the corrosion of the steel
  • Fosroc Mulseal DP – a bitumen rubber/latex compound with low water vapour permeability