Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
M67 Oldham Street Bridge | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Route One worked with Balfour Beatty Mott MacDonald in Area 10 to install Sentinel LEJ’s, Sentinel B Type 1 Buried Joints along with Eliminator Waterproofing and APJ’s.

Case Study Case Study

M67 Oldham Street Bridge

Client: BBMM Area 10 ASC

Location: North West

Products: Sentinel LEJ 90, Sentinel B Type 1 Buried Joints, Eliminator Waterproofing (Stirling Lloyd) and Asphaltic Plug Type 2 (Thormajoint ST)

Route One worked in collaboration with Balfour Beatty Mott MacDonald to complete the package of works to the M57 Oldham Street Bridge.

Stirling Lloyd Eliminator was applied to the deck followed by the installation of Sentinel B Type 1 Buried Joints and Asphaltic Plug Joints.

Over three shifts, Route One operatives installed the 50m stretch of Sentinel Longitudinal Expansion Joint system to the central reservation.

  • ECI on installation technique and construction phasing (LEJ/BJ interface)
  • 3No shifts to install 50m of Sentinel LEJ