Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
M1 J38 Emergency Repairs | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Route One attended site to carry out emergency repairs, one day after receiving the call.

Case Study Case Study

M1 J38 Emergency Repairs

Client: A One+ Area 12

Location: Yorkshire and the Humber

Products: Sentinel Nosing Mortar, Safetrack HW, PAR 1 Primer, 1-3mm Dressing Stone

A One+ Structures Supervisor made the call and within the same day Route One Contracts Manager, Andy Evans, was on site to make an assessment. A crew was mobilised and attended site the following evening.

Route One excavated the defective area then cleaned, primed and reinstated with Stirling Lloyd Nosing Mortar. The newly installed mortar was then covered with Safetrack HW and a 1-3mm aggregate to create an Anti-Slip Surface.

Due to Route One’s rapid response, minimal time was spent on site, resulting in minimal disruption to road users.

  • Rapid response
  • Emergency repairs
  • Minimal disruption to road users