Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
M1 Higham Common | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

The works included refurbishing two verge plates, installing two EMR 80 joints, three kerb cover plates and refurbishment of one existing kerb plate.C

Case Study Case Study

M1 Higham Common

Client: Aone + Area 12

Location: Yorkshire and the Humber

Products: Sentinel EMR80, PAR1 Primer,  ZED S 94 Primer, Theoflex 600 Polysulphide, Fischer Fixings Anchor Bolts and Resin

The scheme involved the removal and refurbishment of existing mining plates (cantilevered over the air gap) in the south joint of the carriageway. These were then re-secured using specialist anchors from Fischer Fixings prior to installation of Stirling Lloyd’s EMR80 joints.

None of the work associated with the mining plates was anticipated prior to starting works and Route One worked with Aone+ to ensure best delivery for Highways England.

  • Route One worked closely with Aone+ once the mining plate issues were discovered, ensuring the best delivery for Highways England.
  • 12m lin completed in 5No shifts including removal of existing joint and mining plate refurbishment