Case Study Case Study

Lockeridge Bridge

Client: Balfour Beatty Civil Engineering

Location: South West

Products: Eliminator Bridge Deck Waterproofing – Two Coat

Route One carried out waterproofing using Stirling Lloyd’s Eliminator Two Coat System at Lockeridge Bridge as part of the refurbishment works.

The works consisted of enclosed shot blasting to the bridge deck before application of the Eliminator waterproofing system. The works were all carried out in one daytime shift.

  • >80m2 deck preparation (enclosed shot blasting)
  • Two coat Eliminator waterproofing and Tack Coat No2
  • Works completed in one day shift