Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Hilton Lane | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Route One were employed by Jackson Civil Engineering to carry out works at Hilton Lane in Telford.

Case Study Case Study

Hilton Lane

Client: Jackson Civil Engineering

Location: West Midlands

Products: Stirling Lloyd One Coat Eliminator, B5 Buried Joint and Theoflex 600 Polysulphide Joint Sealant

Route One operatives installed a Stirling Lloyd B5 Buried Joint before applying the Stirling Lloyd Eliminator waterproofing system to the deck.

Following resurfacing of the bridge, a crack inducer above the joint was installed.

  • Deck preparation and enclosed shot blasting
  • 900m2 of Eliminator (One coat) installed in 2No shifts
  • Polysulphide joint sealant
  • Associated concrete repairs
  • 12m lin of Sentinel B5 joint installed in 1No shift