Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Fall Lane | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

The works included installing bituminous emulsion to the sills (50m2).

Case Study Case Study

Fall Lane

Client: AMCO

Location: Yorkshire and the Humber

Products: One Coat Eliminator, Bituminous Boards, Mulseal DP Bituminous Latex Emulsion. Stirling Lloyd Hytec Sheet Membrane and Geo 1000

Trims were then fitted along with one layer of Geo 1000 and Hytec sheet membrane (80m2). These works included laying out the Hytec and Geo 1000 once the bridge had been placed and heat welding the Hytec joints.

A second layer of Geo 1000 was then installed before the bituminous boards were installed to vertical faces on the bridge deck to protect the installed waterproofing.

  • Early contractor involvement on installation technique
  • Pre-installation carried out off-site
  • Works carried out Christmas Day/Boxing Day
  • Protection boards used for transportation to site