Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
A63 Daltry Street Emergency Repair - Route One infrastructure
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

A63 Daltry Street Emergency Repair

Case Study

A63 Daltry Street Emergency Repair

Client: Amey Area 12 M&R

Location: Yorkshire and the Humber

Products: GCP Sentinel EMR Expansion Joint System

Route One Infrastructure was contacted by Amey Area 12 M&R to undertake an emergency bridge joint repair on the A63 Flyover, one of the main trunk roads in and out of Hull.

The lane was closed as a result of the failure and opening it back up to the customer was a high priority for National Highways.

We responded to the request with our first available crew and repaired the joint so the customer could continue undisrupted in the morning, limiting both the impact on the customer and ensuring the Amey Area 12 M&R project remained on track.

If you have similar requirements for emergency bridge joint repairs and would like to work with a team that is able to provide a quick service, please do hesitate to get in touch with one of our team.