Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
A19 Tyne Tunnel | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

A19 Tyne Tunnel

Case Study

A19 Tyne Tunnel

Client: Highways England

Location: North East

Products: Inspect 244 elastomeric bearings on the A19 Silverlink junction.

Route 1 Infrastructure were employed by Highways England to inspect 244 elastomeric bearings on the A19 Silverlink junction. The structure comprised of 4 independent sections, each with 3 spans. Each span had a fixed end and free end. The fixed elastomeric bearings each had 2no steel dowels cast into the below concrete. The abutments were accessed on foot by climbing the revetments and the pier locations accessed by a MEWP. Due to the location, the inspection was undertaken at night over a two week period. The report provided to Highways England contained our findings and included recommendations for remedial works on the bearings where required.