Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Fiddlers Elbow | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Alun Griffiths employed Route One to carry out the waterproofing works to Fiddlers Elbow Bridge in Treharris.

Case Study Case Study

Fiddlers Elbow

Client: Alun Griffiths (Contractors) Ltd

Location: Wales

Products: Stirling Lloyd's PAR 1 Primer, Two Coat Eliminator System, Bond Coat No.3

Deck preparation was carried out through shot blasting to provide the required adhesion before applying Stirling Lloyd’s PAR 1 Primer to the concrete deck.

Route One then applied Stirling Lloyd’s two-coat Eliminator waterproofing system, followed by Bond Coat No.3 in order to ‘bond’ together the waterproofing and the surfacing that would follow.

Spark tests were conducted to assess the integrity of the waterproofing membrane, followed by a ‘pull-off’ test to determine the adhesion strength between the membrane and the deck.

Due to the adverse weather conditions and the tight programme restrictions, Route One secured the use of a jet engine drying machine which enabled the works to be completed within these tight constraints.

  • Stirling Lloyd’s Waterproofing System
  • Used Drying Machine to accelerate programme
  • Bond Coat to ‘bond’ together the waterproofing and surfacing