Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Teign Viaduct Urgent Bridge Works | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Route One were awarded an urgent £235,000 contract to permanently repair the largest bridge in Devon.

Case Study Case Study

Teign Viaduct Urgent Bridge Works

Client: South West Highways

Location: South West

Products: Multi-Element Expansion Joint

As one of only a few UK based operators experienced to carry out the removal and installation of large multi-element joints, Route One were awarded the permanent repairs to the failed expansion joint on the 40 year old bridge.

• Urgent bridge works awarded to Route One
• Repairs to multi-element expansion joint
• Using Hydrodemolition process to remove concrete from joint
• Limited disruption to traffic flow