Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Regent St Flyover, Leeds | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Regent St Flyover, Leeds

Case Study Case Study

Regent St Flyover, Leeds

Client: Balfour Beatty

Location: Yorkshire and the Humber

Products: Spray Applied Waterproofing, Flexible Bridge Joints, Modular Bridge Joints, Buried Joints, Bridge Deck Concrete Repairs

Route One were initially contracted by Balfour Beatty to undertake bridge deck preparation, waterproofing and bridge joint replacement to the existing bridge deck and replacement bridge as part of the major bridge deck and structures refurbishment.

Once the project commenced, Route One were instructed to undertake a significant change to the scope of works by completing over 1000m2 of bridge deck repairs which also involved hydro-demolition and temporary works prior to the waterproofing installation. Route One managed to secure significant additional resources to ensure the programme deadlines were met.

Main Activities

  • 8000m2 of spray applied waterproofing
  • 8000m2 of bridge vacuum shot blasting
  • 6000m2 of bridge deck waterproofing removal
  • 350lm of flexible bridge joints
  • 50lm of modular bridge joints
  • >1000m2 of bridge deck concrete repairs
  • 100lm of buried joints